Skip to content
Solar Farm Facts

- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
太阳城app下载
太阳城网址
Buy-ball-app-admin@xlhl.net
365体育投注
Sun-City-billing@xyschool.net
欧洲杯买球
沂源信息网
Online-gambling-platform-admin@ehulk.net
European-Cup-buying-entrance-support@babyfeedingshop.com
麦可思
皇冠体育
自立新材
启海人才网
苗圃医考网
新葡京博彩官网
内蒙古师范大学鸿德学院
新葡京博彩
Crown-Sports-marketing@berxwedan.net
Sabah-sports-betting-feedback@smxjjl.com
Crown-Sports-Betting-media@yopin365.com
哈尔滨体育学院
58同城萍乡分类信息网
巴拉巴拉品牌官方网站
欣欣旅游搜索
河南牧业经济学院官网
游戏网
广建咨询
《地城之光》手机版官方网站
爱标志网
企业家日报数字报
站点地图
Longchamp中国
中国
枣阳政务网
长虹集团官网